Step 1) dig a trench to lay the plumbing:


Step 2) lay the plumbing pipes and connect them to the waterline.
Step 3) pourback the concrete
Step 4) build, build, build
Step 5) open, open, open.

All the happenings at the Curious Comedy Theater, 5225 NE MLK Blvd. Portland, OR
No comments:
Post a Comment