Stacey was in rare form on the second day of our auditions. It was a bit warm and dusty in our theater the previous day, so we got there early to mop the floor. After the floor was sufficiently mopped, Stacey poured a bag of ice out onto the ground to "cool off the stage area"...
Seeing how our space is an empty shell, the bottom 8 feet of the walls are not done. There's no drywall there because we'll need to run electricity and other such line along the wall, so we had exposed insulation along our backwall. One piece of insulation was sliding down and it was bothering Stacey.
Without gloves, she used the bag of the recently emptied 'bag o' ice' to do her best job of pulling up some falling insulation...
Thursday, July 3, 2008
Subscribe to:
Post Comments (Atom)
1 comment:
Perhaps Stacey is living out her dream of operating on a giant, pink, inverse cube shaped muppet.
Post a Comment